Change Order Generator (Construction & Projects)
Every change priced, timed and signed before the work starts.
Try before you buy.
- Free preview: each change order and the register as page images marked “MySmartCoPilot preview · not for use”, with the totals and the revised contract sum hidden.
- Locked until you unlock it: download.
- Unlock: Premium pass, ₹799 for 30 days, a one-time payment that never renews.
Ways to unlock shows how to get the full result.
Printing this result is locked in the free preview.
This browser is not keeping data for this page (private mode or storage switched off). Your work stays only until the tab closes: download a backup on the Project tab.
Project
Parties and signatories
Contract
Letterhead
CPWD contracts: extra time for extra cost (clause 12.1)
Under clause 12.1 of the CPWD General Conditions of Contract, the time for completion is extended in the proportion that the additional cost bears to the tendered value, plus 25% of that time. Each change order then shows the days this gives for its cost before tax.
Your data
No change orders yet. Press New change order, or open the example project to see one filled in.
The change
Cost breakdown
Quantity × rate, or leave both empty and type a lump sum. Tick credit for work that is omitted.
Paste lines from a spreadsheet
Time and terms
Summary
The amounts the tool worked out show in full once this change order is unlocked; the page images on the Documents tab carry them as bars until then.
Register
| No. | Raised | Title | Status | Amount | Days | Contract value after |
|---|
Only approved change orders change the contract sum and the completion date, in number order. Press a number to open that change order.
Documents
Locked in the free preview. Opens the ways to unlock this result.
Locked in the free preview. Batch runs unlock with a pass.
Locked in the free preview. Query results unlock with a pass.
For general information only, not legal advice. Templates are generic starting points — have a qualified lawyer review anything you rely on.
About the Change Order Generator (Construction & Projects)
A change order (also called a variation order or change request) records a change to the agreed scope and gets it priced and approved before the work starts. Describe the change and why it is needed — a client request, a design change, a site condition — list the drawings, BOQ items and specification clauses it affects, and build the cost from labour, materials, equipment, subcontract and other lines, with credits for work omitted, overhead and profit percentages and tax. Add the time impact in days, and the change order shows the contract sum and the completion date before and after it, with signature blocks for the owner, the contractor and the engineer.
Every change order goes into the register, numbered CO-001, CO-002 … with its status: approved, pending, rejected or withdrawn. The register adds up each group, keeps the running contract value of the approved changes in number order and moves the completion date by their days. Presets set the cost categories, reasons and party names for construction, interior fit-out, IT projects and consulting. The free preview shows each change order and the register as marked page images with the totals hidden; a Premium pass unlocks the clean PDFs and the Excel register.
How to use it
- On Project, pick the preset (construction, interior fit-out, IT project or consulting), name the project and the parties, and enter the original contract sum, the completion date and the currency.
- On Change order, press New change order. Give it a title, the reason and a description, and list the drawings, BOQ items or clauses it affects.
- Add the cost lines: quantity × rate, or a lump sum. Tick credit for work that is omitted. Set overhead, profit and tax, and the time impact in days.
- Set the status as it moves: draft, submitted (pending), approved or rejected, with the date it was decided. The Register tab adds everything up.
- On Documents, check the change order and the register page by page. With a Premium pass, or after unlocking a document, its PDF and the Excel register download; your backups always do.
Examples
Labour 18 days × ₹1,200 + materials ₹38,500 + tiles 12 m² × ₹950 + plumbing subcontract ₹26,000 · overhead 10% · profit 10% · GST 18% · 12 days
Direct cost ₹97,500 + overhead ₹9,750 + profit ₹10,725 = ₹1,17,975 + GST ₹21,235.50 = change order ₹1,39,210.50; contract ₹48,50,000 → ₹49,89,210.50; completion moves 12 days
Credit: 22 m² of jali × ₹2,400 = −₹52,800; plaster and paint instead ₹9,800 · markup on credits ticked
Direct −₹43,000; overhead −₹4,300; profit −₹4,730; subtotal −₹52,030; GST −₹9,365.40; change order −₹61,395.40 (a credit to the owner)
Original contract sum ₹48,50,000 · completion 31 Dec 2026 · CO-003 (rock in the sump excavation, ₹53,970.84, 6 days) pending
Approved ₹77,815.10 (1.6%) → current contract sum ₹49,27,815.10; with the pending one ₹49,81,785.94; completion 12 Jan 2027 (18 Jan 2027 if CO-003 is approved)
Common uses
- Contractors pricing extra work and omissions for an owner’s approval.
- Owners, architects and project managers keeping track of approved and pending changes against the contract sum.
- Interior designers and fit-out firms issuing variation orders to clients.
- IT suppliers and consultants raising change requests against a fixed-price project.
How a change order is priced
- Line amount = quantity × rate, or the lump sum you type; a credit (omitted work) counts negative. Every amount is rounded to the currency’s smallest unit.
- Direct cost = the sum of the lines, also shown by category.
- Overhead = direct cost × overhead %. Profit = (direct cost + overhead) × profit %.
- Subtotal = direct cost + overhead + profit; tax = subtotal × tax %; the change-order total = subtotal + tax.
- A change that is a net credit is passed on at cost unless you tick markup on credits, which takes overhead and profit off it as well — use whatever your contract says.
The register, the contract sum and the completion date
Change orders are listed in number order. Only approved ones change the contract: the contract value after each approved change order is the original contract sum plus the approved totals up to it, and the revised completion date is the original date plus their days. Pending change orders are added up separately, with the sum and the date you would reach if they are approved; rejected and withdrawn ones are counted but change nothing. Each change order’s document shows the net change of the approved ones before it, its own amount and the contract sum with it, so every signed copy tells the whole story.
Presets: construction, fit-out, IT projects and consulting
- Construction: labour, materials, plant and equipment, subcontract; owner, contractor and engineer or architect; reasons such as unforeseen site conditions and authority requirements.
- Interior fit-out: materials and finishes; furniture, fixtures and equipment; electrical, plumbing and HVAC; titled variation order.
- IT projects: effort in person-days, software and licences, hardware, third-party services; titled change request, between client and supplier.
- Consulting: professional fees, expenses and subconsultants.
The title (change order, variation order or change request), the categories and the reasons follow the preset; you can change the title and every line.
Contracts based on CPWD conditions
Under clause 12 of the CPWD General Conditions of Contract the engineer-in-charge may alter, add, omit or substitute work, and the changed work is done on the same conditions and at the same rates as the main work, except as the clause provides. For an extra item the contractor may claim a rate, with its analysis, within fifteen days of the order; for quantities beyond the limits in Schedule F the rates may be revised on market rates. The time for completion is extended, on request, in the proportion that the additional cost bears to the tendered value, plus 25% of that time (clause 12.1). Tick CPWD clause 12.1 on the Project tab and enter the tendered value and the stipulated period: each change order then shows the days the clause gives for its cost before tax, which you can use as its time impact.
Good practice
- Get the change order signed before the work starts: a change done on a verbal instruction is the most common source of disputes over final bills.
- Refer to the exact drawing revision, BOQ item or clause, and keep the reason factual.
- Price omissions as credits on the same change order as what replaces them, so the net effect is clear.
- Say whether the time impact is settled (“full and final”) or reserved; leaving it unsaid invites a later claim.
- Number change orders once and never reuse a number, even for a rejected one.
Sources
- CPWD General Conditions of Contract — clause 12 (deviations, extra and substituted items, and the extension of time for additional cost in clause 12.1)
Your contract’s own variation clause decides how changes are ordered, valued and paid.
Limitations
- Amounts are worked out from the lines and percentages you enter; the tool does not check market rates or your contract’s rules for valuing changes.
- One tax rate applies to a whole change order. Split a change into two change orders when its parts carry different rates.
- Days are calendar days added to the completion date; working-day calendars and partial overlaps between changes are not modelled.
- Signatures are blank blocks for signing on paper or with your own e-signature service.
- Your project is kept in this browser on this device: download a backup to move it or keep it safe.
Privacy
The project and its change orders are kept in this browser’s storage on your device and never sent to MySmartCoPilot or anyone else. The PDFs and the workbook are made on your device; a backup leaves it only when you download it.
Frequently asked questions
What do I get without a pass?
Without a pass, Change Order Generator (Construction & Projects) shows each change order and the register as page images marked “MySmartCoPilot preview · not for use”, with the totals and the revised contract sum hidden. Until you unlock it, the result can’t be downloaded. A Premium or Ultimate pass, a one-time payment that never renews, unlocks the full result. The pricing page lists the passes and their prices.
What is the difference between a change order, a variation order and a change request?
They are names for the same record in different trades: change order in most construction contracts, variation order in many fit-out and Commonwealth contracts, change request in IT and consulting. Choose the title on the Project tab; the content is the same.
Should overhead and profit be added to a credit?
It depends on the contract. Many contracts take the contractor’s overhead and profit off omitted work too; others pass a credit on at cost. Tick markup on credits for the first, leave it unticked for the second.
Which change orders change the contract sum?
Only approved ones. Pending change orders are shown separately, with the contract sum you would reach if they are approved; rejected and withdrawn ones change nothing.
How is the revised completion date worked out?
The original completion date plus the days of the approved change orders (a negative number of days brings it forward). Enter 0 for a change that does not affect the programme.
Can I use it for an IT or consulting project?
Yes. Pick the IT project or consulting preset: the cost lines become effort, licences, hardware and services (or fees and expenses), the parties become client and supplier or consultant, and the document is titled change request or change order.
Where is my project kept?
In this browser on your device. You don’t need an account; download a backup from the Project tab to keep it safe or open it on another device.