BOQ Rate Analysis & Bid Margin Optimizer
Every BOQ item’s rate built up, and the lowest quotation worth winning.
Try before you buy.
- Free preview: every count and total, the minimum profitable quotation and the margin at your bid, with the first rows of each table (up to 10; one item with its rates hidden).
- Locked until you unlock it: download and copy.
- Unlock: Premium pass, ₹799 for 30 days or ₹249 for 1 week, a one-time payment that never renews. Unlock: Premium pass, $19.99 for 30 days or $7.99 for 1 week, a one-time payment that never renews.
Ways to unlock shows how to get the full result.
Printing this result is locked in the free preview.
Your bill of quantities
Add the BOQ of the tender: the e-procurement price schedule (the “BoQ” workbook), a schedule of quantities or your own costing sheet. Its header row and columns are found by their names; check them under “Columns”.
Columns
Match each column of your sheet; a row without a quantity is read as a heading.
How the items are costed
Any item can be costed its own way — its own costs or a rate analysis of materials, labour and machinery: press “Cost it” in the table, or find it here. An item the chosen way cannot cost is costed another way it can, and says which.
Split of a cost known as one figure
An estimated rate or a single cost column is split this way into materials, labour, machinery, carriage and other, for the cost breakdown and the “if costs rise” view. It is scaled to 100%.
Overheads, risk and profit
Example values to start from: set your own.
Your bid
Result
— margin at your bid
What the analysis found
Details
Your rate library
Your rates for materials, labour and machinery, used by every rate analysis. A rate can be per your own unit: cement per bag, sand per cum, cft or brass, bars per kg, bricks per 1,000.
| Resource | Part | Unit | Rate (₹) | Remove |
|---|
Your projects
Keep this bill with its settings and item costings in this browser, and open it again later.
How the rates are built up
- Direct cost (A) = materials with wastage + labour + machinery + carriage + other; water charges are a % of A (1% in the CPWD analyses), and B = A + water charges. CPWD Analysis of Rates for Delhi, Volume 1
- CPWD adds 15% to B for the contractor’s profit and overheads; here overheads, contingency and the cost of money go on B one by one, and your profit on the whole: rate = cost × (1 + profit) ÷ (1 − deductions from bills), each step to the paisa and the rate to 5 paise, the analyses’ “Say”. CPWD Analysis of Rates for Delhi, Volume 1
- An estimated rate built the CPWD way gives the schedule’s direct cost as rate ÷ (1 + water %) ÷ (1 + profit and overheads %), which your cost index then scales.
- The rate-analysis templates carry the quantities the CPWD analyses give for 8 common items, without prices: 2.8.1 earth work in excavation in foundation trenches, all kinds of soil; 3.11 cement mortar 1:6 (1 cement : 6 coarse sand); 4.1.3 cement concrete 1:2:4 (20 mm graded stone aggregate); 4.1.5 cement concrete 1:3:6 (20 mm graded stone aggregate); 4.1.8 cement concrete 1:4:8 (40 mm graded stone aggregate); 5.1.2 reinforced cement concrete 1:1.5:3 up to plinth level (without steel and formwork); 5.22.6 tmt reinforcement for rcc work up to plinth level; 6.1.2 brick work, burnt clay bricks of class 7.5, in cement mortar 1:6 (foundation and plinth). CPWD Analysis of Rates for Delhi, Volume 1
Source: CPWD Analysis of Rates for Delhi, Volume 1 (opens in a new tab). The rates are yours; nothing is looked up. An estimate to price a bid with, not financial or tax advice.
Last verified 14 Oct 2026 against these sources.
Locked in the free preview. Opens the ways to unlock this result.
Locked in the free preview. Batch runs unlock with a pass.
Locked in the free preview. Query results unlock with a pass.
Results are estimates for general information and planning, not financial advice. Banks and institutions may calculate differently (rounding, fees, rate changes). Confirm figures with your lender or a qualified adviser before deciding.
How this tool is checked
- Based on
- the rules of India, as set out under ‘How each rate is built up’.
- Sources
-
This guide cites one source:
- Tests
- 24 automated tests check its results.
- Found an error?
- Report a problem or write to support@mysmartcopilot.com, with what you entered and the result you expected.
About the BOQ Rate Analysis & Bid Margin Optimizer
Price a tender’s bill of quantities the way a rate analysis does, for every item at once. Add the BOQ — the e-procurement price schedule (the “BoQ” workbook of CPPP and state portals), a CPWD-style schedule of quantities or your own costing sheet — and each item’s rate is built from its materials, labour, machinery and carriage, with wastage, water charges, your overheads, a contingency, the cost of money until you are paid, a share of the lump sums (mobilisation, site office, insurance) and your profit, after the deductions taken from every bill, and GST where you quote with it.
The items are costed from their estimated rate (a CPWD schedule rate less the 1% water charges and 15% profit and overheads it carries, times your cost index), from the cost columns of your own sheet, from costs you type, or from a rate analysis of materials, labour and machinery at your own rates, with templates that carry the quantities of the CPWD Analysis of Rates for Delhi, Volume 1 for common items. Then you see the break-even, minimum profitable (walk-away) and target quotations against the estimate, the profit and margin at any bid — a percentage above or below the estimate, a total or the rates in your file — a bid ladder, the totals by section, where the money goes and what dearer materials, labour or machinery would do to your margin.
Without a pass the result is a free preview: every count and total, the quotations and the margin at your bid in full, and the first rows of each table; the full item rates, the priced BOQ and rate analysis in Excel, the PDF bid-pricing report, the CSV and the copied rates come with a Premium pass. Your bill, your rate library and your projects stay in this browser.
How to use it
- Add the bill: drop the tender’s BOQ file (CSV or Excel), paste its rows, or try the example. Check that the header row and the columns were found, under “Columns”.
- Choose how the items are costed: from their estimated rates (with your cost index, 90% if you work 10% below the schedule’s cost), from cost columns in your file, or from costs you type. Open any item with “Cost it” to give it its own costs or a rate analysis from a template.
- Set the water charges, overheads, contingency, cost of funds, the deductions from your bills, any lump sums, your target and minimum profit, GST and the rounding of rates.
- Test your bid as a percentage above or below the estimate, a total, or the rates already in the file, and read the walk-away, the ladder and the checks.
- With a Premium pass, or after unlocking this result, download the priced BOQ with its rate analysis (Excel), the bid-pricing report (PDF) or the item rates (CSV), or copy the rates one per row to paste into the tender’s BOQ.
Examples
Materials, carriage, labour, machinery and sundries of the analysis: ₹4,706.23
+ 1% water charges ₹47.06 = ₹4,753.29 · + 15% profit and overheads ₹712.99 = ₹5,466.28 · say ₹5,466.30
Each step is rounded to the paisa and the rate to 5 paise, as the analyses print it.
A ₹1,00,000 estimate of CPWD-style rates (100 cum at ₹600 and 50 cum at ₹800) · your direct cost at 90% of the schedule’s · 1% water, 6% overheads, 1.5% contingency, 12% a year for 2 months · 1% deducted from bills · minimum profit 3% on cost
Cost ₹85,694.50 · walk-away ₹89,156.90, 10.8% below the estimate · a bid at 6% below leaves ₹7,365.50, a margin of 7.8%
TMT reinforcement: 1.05 quintal of bars (5% wastage), carriage, cover blocks, a blacksmith and a beldar for 100 kg
The analysis covers 100 kg of the item, so its cost ÷ 100 is the rate per kg.
“Copy the rates” on a bill whose items sit between section headings
One line for every row from the first item to the last, empty on the heading rows, so the rates land on their items when pasted into the rate column.
Common uses
- Contractors pricing a percentage-rate tender: how far below the estimate they can go.
- Filling the rate column of an item-rate BOQ from a cost build-up, with rates that add up to the bid.
- Checking which items are priced far below or above the estimate before submitting.
- Estimators keeping a rate library and projects in the browser and handing the priced BOQ to a partner as Excel or PDF.
How each rate is built up
- A = materials (with wastage when you cost them yourself) + labour + machinery + carriage + other, for the quantity analysed
- B = A + water charges (A × water %; the CPWD analyses add 1%)
- C = B + overheads + contingency + cost of money, each B × its %; the cost of money is your cost of funds × the months your money is in the work ÷ 12
- C′ = C + the item’s share of the lump sums, in proportion to C
- Price of the bill = total cost × (1 + profit % ÷ 100) ÷ (1 − deductions %) for a profit on cost, or total cost ÷ (1 − deductions % − margin %) for a margin on the price
- Rate = C′ × price ÷ total cost, rounded to the paisa, 5 paise (CPWD’s “Say”), the rupee or ₹10; walk-away rates are rounded up so they never add up to less than the walk-away
The CPWD analyses add 15% for the contractor’s profit and overheads (CPOH) on B (CPWD Analysis of Rates for Delhi, Volume 1); setting overheads at 15% and the rest at 0 reproduces their rates exactly.
Costing from the estimated rate
A CPWD schedule rate already includes 1% water charges and 15% profit and overheads, so the schedule’s direct cost of an item is its rate ÷ 1.01 ÷ 1.15. Your cost index scales it to your own cost: 100% if you work at the schedule’s cost, 92% if your materials, labour and machinery cost 8% less. The direct cost is split into materials, labour, machinery, carriage and other by the composition you set, for the breakdown and the “if costs rise” view. Untick “The estimated rates include water charges and profit and overheads” for an estimate built without them, and tick GST when the estimated rates include it.
Rate analysis and the rate library
The templates carry the quantities of materials, carriage, labour and machinery that the CPWD Analysis of Rates for Delhi, Volume 1 gives for earthwork in foundation trenches, cement mortar 1:6, cement concrete 1:2:4, 1:3:6 and 1:4:8, RCC 1:1.5:3, TMT reinforcement and brick work in cement mortar 1:6 — without any of its prices. Your rate library supplies the rates, in the units you buy in: cement per bag, sand per cum or brass, bars per kg, bricks per thousand. A template for 10 cum or one quintal covers that much of the item: steel billed by the kilogram gets the analysis of a quintal for 100 kg. Analyses differ between editions, schedules and methods (machine mixing, ready-mixed concrete), so check the quantities against the analysis your contract uses; every line can be changed.
Break-even, walk-away and target
- Break-even quotation: the price at which the bill earns nothing after its deductions.
- Minimum profitable quotation (walk-away): the price that keeps your minimum profit; below it, bidding means taking less than you decided you need.
- Target quotation: the price with your target profit.
- Your bid: a percentage above or below the estimate (a percentage-rate tender), a total, or the rates you have filled in the file (an item-rate tender), with its profit, margin and verdict.
The bid ladder lists the bids in 2.5% steps around the estimate with these prices among them.
Files it reads
- The e-procurement price schedule of CPPP and state portals: rows about the tender, a row of data types, the header (“Sl. No., Item Description, Quantity, Units, Estimated Rate…”), a row of column numbers, sub-head headings and items.
- A CPWD-style schedule of quantities: sub-heads, main descriptions continued by sub-items (“(a) All kinds of soil”), quantities, units, rates and amounts.
- Your own costing sheet with material, labour, machinery and carriage columns.
CSV (with or without a byte-order mark, quoted fields with commas), TSV, Excel (xlsx, xls) and ODS, up to 50,000 rows a sheet. Amounts may carry ₹, Rs. or INR, a closing “/-” and Indian digit grouping (1,23,456.78); units such as cum, cu.m, sqm, Rmt, kg, MT, quintal, Nos and LS are recognised, also beside the quantity (“250 cum”). Total, carried-over and amount-in-words rows and GST columns are left out.
Limitations
- The rates are yours: nothing is looked up, and the tool does not know market prices or other bidders’ rates.
- The templates hold the CPWD Delhi analysis quantities for a few common items; other schedules, methods and sites need other quantities.
- It does not fill the tender portal’s own BOQ file for upload: copy the rates into it, or use the priced BOQ to check yours.
- Securities, BOCW-type cess, TDS and GST rules differ by contract and state: set the deductions and GST your contract states.
- At most 50,000 items are read from one sheet.
- An estimate to price a bid with, not financial or tax advice.
Privacy
On this device; its files download once
Your bill is read in your browser, in a background worker, and never uploaded. Your settings, rate library, column matches and the projects you keep stay in this browser’s storage until you remove them.
Frequently asked questions
What do I get without a pass?
Without a pass, BOQ Rate Analysis & Bid Margin Optimizer shows every count and total, the minimum profitable quotation and the margin at your bid, with the first rows of each table (up to 10; one item with its rates hidden). Until you unlock it, the result can’t be downloaded or copied. A Premium or Ultimate pass, a one-time payment that never renews, unlocks the full result. The pricing page lists the passes and their prices.
How much below the estimate can I quote?
Down to the minimum profitable quotation: the price that still covers your cost of every item, your overheads, contingency, cost of money and the deductions from your bills, and leaves your minimum profit. The tool shows it as a percentage against the estimate, with the profit and margin at any bid you test.
What are water charges and CPOH in CPWD rate analysis?
The CPWD analyses add 1% of the direct cost of materials, labour and machinery for water, then 15% on that total for the contractor’s profit and overheads (CPOH). A CPWD schedule rate already carries both, which is why the tool takes them out before adding your own.
Can I analyse an item from its materials, labour and machinery?
Yes: open the item with “Cost it”, choose a rate analysis and start from a template or write your own lines. Each line is a quantity for the analysed quantity × your rate; your rate library fills the rates in and converts units (a cement rate per bag becomes one per tonne).
Does it read the BOQ workbook of e-procurement portals?
It reads the price schedule’s rows — the header with Sl. No., Item Description, Quantity, Units and Estimated Rate, the data-type row and the column numbers, the sub-head headings and the items — from Excel or CSV. It does not write that protected workbook: copy the rates into it.
Should my rates include GST?
As your tender asks. Tick “Quote with GST” when the rates and the totals you type must include it; the tool then shows them with GST and works out the profit on the price without it. Tick “The estimated rates include GST” when the estimate does.
Do I need a pass?
To see every item’s rates and download or copy the priced BOQ and the reports, yes: a Premium pass unlocks every Premium tool. Without a pass you see a free preview of your own bill: every count and total, the quotations and the margin at your bid, with the first rows of each table.