Construction Agreement Generator (India)

The owner–contractor agreement for building a house, with payment stages and annexures.

Free preview, no sign-upIncluded in your pass Premium tool Premium pass: ₹799 for 30 days No upload
+2 more details Construction For India

Try before you buy.

  • Free preview: every page with your details, the first part of the wording readable and the rest hidden, marked “MySmartCoPilot preview · not for use”.
  • Locked until you unlock it: download, copy and print.
  • Unlock: Premium pass, ₹799 for 30 days, a one-time payment that never renews. Sold only in rupees.

Ways to unlock shows how to get the full result.

See passes (opens in a new tab)

Printing this result is locked in the free preview.

Jump to preview

The agreement

Its stamp law decides the stamp duty on this agreement.

Owner

Contractor

Checks and measures the work and certifies stages for the owner. Leave it empty if the owner does this.

Site and work

Leave it empty if it is still to come: the agreement then makes it the owner’s duty to get it before the work starts.

Scope

What the contractor provides
The price includes only the allowance; a dearer or cheaper choice is added or deducted.

Drawings and specifications

They become annexures of the agreement. Leave them empty to print blank tables to fill in by hand.

Drawings
Specifications

Price

How the work is priced
Bill of quantities optional: used to value changes
Paste items from a spreadsheet

Payments

The contractor is paid
Payment stages

Each stage is paid as a share of the price once that work is complete. The shares below are an example: change them to what you agree.

Time and delay damages

The work starts

The agreement asks for a joint hindrance register at the site; the Hindrance Register & EOT Calculator keeps one.

Liquidated damages for delay

The owner’s likely loss from a delay, a month

A genuine pre-estimate: what the owner will lose while the house is late. The agreement names these heads as the reason for the figure.

Price adjustment (escalation)

If prices change during the work

Defects, site, labour and insurance

Changes during the work go through signed change orders; the Change Order Generator numbers them and keeps the register.

Disputes and signing

Disputes are decided by
An independent person: never a party, an employee or the owner’s architect or engineer.
Witnesses

Checks

    Preview

    Highlighted hints mark fields you have not filled in; downloads and printouts show a blank line there instead. To print, choose your printer or “Save as PDF” and turn off “Headers and footers”.

    Next steps Done. What next?

    All construction & home calculators

    For general information only, not legal advice. Templates are generic starting points — have a qualified lawyer review anything you rely on.

    About the Construction Agreement Generator (India)

    A construction agreement settles, before the first brick is laid, what the contractor builds, for how much, by when, and what happens when something changes or goes wrong. Enter the owner, the contractor and the site, choose the scope — labour only, material and labour or turnkey — and how the work is priced: a lump sum, item rates on a bill of quantities, or a rate per sq ft of built-up area. The generator writes the agreement for building a house or a small commercial job in India, with the site schedule, the drawings, the specifications and the bill of quantities as annexures and a stage-wise payment schedule.

    The stages follow the work — plinth, each roof slab, brickwork, plastering, flooring, services and finishing — or the stage list of the Construction Cost Calculator, with a mobilisation advance recovered stage by stage and retention money held back for the defects liability period. The agreement covers the time for completion with extensions for hindrances recorded in a joint register, liquidated damages worked out from the owner’s likely loss as a genuine pre-estimate, price adjustment by an index formula or by base rates of cement and steel (or none), safety and labour-law duties, insurance, change orders, termination and arbitration. The checks say what to fix and link the State’s stamp department. The free preview shows every page with your details and the first part of the wording; a Premium pass unlocks the DOCX, the PDF, copying and printing.

    How to use it

    1. Enter the owner (add joint owners) and the contractor — a firm, a company, or a sole proprietor with the business name and GSTIN — and the owner’s architect or engineer, if one will check the work and certify the stages.
    2. Describe the site and the work (floors, built-up area, building permission), choose the scope, and list what is not included and the allowances for items the owner will choose, such as tiles and fittings.
    3. Choose how the work is priced and paid: the lump sum, or the bill of quantities (pasted from a spreadsheet); the payment stages (slab-wise for your floors, or the Construction Cost Calculator’s stages or its CSV); the advance and the retention.
    4. Set the start, the time for completion and the delay damages: enter the rent and the loan interest a delay would cost the owner, and use the weekly figure it gives.
    5. Pick the price adjustment, the defects liability period, the insurance and the disputes clause, name two witnesses and read the Checks. Look through every page in the free preview; with a Premium pass, download the DOCX or the PDF, print it on the e-stamp paper and sign it.

    Examples

    A G+1 bungalow: material and labour, lump sum
    Input
    Lump sum ₹58,50,000 + GST · advance 5% · retention 5% · slab-wise stages for 2 floors
    Result
    Plinth and each roof slab 15% (₹8,77,500), other stages 10% (₹5,85,000) and the handover 15%. At the plinth the owner pays ₹7,89,750 (₹43,875 of the advance recovered and ₹43,875 retained). In all ₹52,65,000 is paid at the stages, besides the ₹2,92,500 advance, and ₹2,92,500 is held as retention.
    Delay damages from the owner’s likely loss
    Input
    Rent ₹35,000 a month + loan interest ₹28,000 a month · damages capped at 5% of ₹58,50,000
    Result
    ₹63,000 × 12 ÷ 52 = ₹14,538 a week. Agreed at ₹15,000 a week, at most ₹2,92,500, which a delay of 19.5 weeks reaches.
    The Completion Date
    Input
    Start on 1 November 2026 · 12 months
    Result
    Completion Date 31 October 2027: the twelve months begin on the start date.
    A labour contract at a rate per sq ft
    Input
    2,400 sq ft × ₹450 a sq ft · the owner supplies cement, steel, sand, aggregate and blocks · wastage 3%
    Result
    Estimated price ₹10,80,000; the final price follows the built-up area measured on completion. The agreement adds the annexure of the owner’s materials, the daily account of them and the wastage clause.

    Common uses

    • Owners building a house who want the contractor’s promises, the payment stages and the remedies in writing before work starts.
    • Contractors and builders who need a clear agreement for a house, an extension or a small shop or office building.
    • Architects and engineers drafting the owner–contractor agreement for a client, with the drawings and specifications annexed.

    What the agreement contains

    • The parties, the site and the work, with recitals.
    • Definitions and the order in which the documents apply.
    • The scope (labour only, material and labour, or turnkey), exclusions and allowances.
    • The owner’s obligations: the site, the permissions, timely drawings and decisions, payment.
    • The contract price (lump sum, item rates or a rate per unit of built-up area), GST and tax deducted at source.
    • Payment: the advance, stage payments or running bills, the days to pay, interest on late payment and the final bill.
    • Retention money and its release.
    • Time for completion; extension of time for hindrances recorded in a joint register; liquidated damages.
    • Price adjustment, changes by change order, quality and tests.
    • The site, safety and neighbours; workers, labour laws and the building workers’ cess; insurance.
    • Completion and handover, the defects liability period, termination, notices, disputes and general terms.
    • The site schedule and the annexures: drawings, specifications, the bill of quantities, the payment schedule, the owner’s materials and the base rates of materials.

    Labour only, material and labour, or turnkey

    • Labour only: the contractor provides labour, supervision, tools and (if agreed) scaffolding and shuttering; the owner buys the materials. The agreement lists the owner’s materials, asks for a daily account of them and recovers wastage beyond the allowance you set.
    • Material and labour: the contractor provides everything to build as the drawings and specifications say, except what is excluded.
    • Turnkey: the contractor completes the building ready for use — civil, finishing, electrical and plumbing work — and hands it over with the keys, the warranties and drawings of the services as built.

    Allowances (for tiles or fittings the owner will choose) keep the price fair: the price includes only the allowance, and a dearer or cheaper choice is added or deducted.

    How the payment schedule is worked out

    • Stage amount = contract price × the stage’s share. The shares must add up to 100%.
    • Advance recovered at a stage = the advance × the stage’s share.
    • Retention = the stage amount × the retention percentage.
    • Payable at the stage = stage amount − advance recovered − retention.

    Amounts are rounded to the paisa on the running total, so the stages add up exactly to the price and the recoveries to the advance. GST is shown separately when it is charged on top. For item-rate and area-rate contracts the stages are worked out on the estimated price, and the final bill settles the difference.

    Delay damages as a genuine pre-estimate

    Under section 73 of the Indian Contract Act, 1872 the party hurt by a breach gets compensation for the loss that naturally arises from it, or that the parties knew was likely, but not for remote or indirect loss. Under section 74, when the contract names a sum to be paid for the breach, the party complaining gets reasonable compensation not exceeding that sum, whether or not actual loss is proved. So the agreement records the weekly amount, the heads of loss it pre-estimates and a maximum.

    The tool works out the owner’s likely loss: (rent for other accommodation + interest on the loan + other costs, a month) × 12 ÷ 52 for a week. A figure far above it may be cut down to what is reasonable. For comparison, the CPWD General Conditions of Contract (clause 2) charge compensation for delay at 1.5% of the tendered value for each month, worked out by the day, and at most 10% of it.

    Extension of time and the hindrance register

    Hindrances the contractor cannot control — changes, the owner’s delays in giving the site, drawings, decisions or payments, an authority’s stop order, floods, fire or abnormal rain — extend the Completion Date by the delay they actually cause; overlapping days count once. The contractor notifies each one within the days you set (the CPWD conditions use fourteen days, clause 5.3), both sides sign it in a hindrance register at the site, and the extension is applied for and given in writing. The Hindrance Register & EOT Calculator keeps the register and works out the overlaps.

    Price adjustment (escalation)

    • None: the price is firm, which suits a short lump-sum job.
    • Index formula: each payment is adjusted by V = W × [materials % × (Mi − M0) ÷ M0 + labour % × (Li − L0) ÷ L0], where W is the value of the work done in the period, M and L are the official indices you name (for example the wholesale price index and the consumer price index for industrial workers) for the period and for the base month, and the rest of the value is fixed. Work late through the contractor’s fault is adjusted at the indices of the Completion Date. The Price Escalation Calculator works out each period.
    • Base rates of materials: for cement, steel or other named materials, the difference between the invoice price and the base rate beyond the margin you set is added or deducted for the quantity used in the work.

    Arbitration under the 1996 Act

    The disputes clause sends a dispute first to discussion (and mediation, if you tick it), then to a sole arbitrator appointed by agreement or, failing agreement, under section 11 of the Arbitration and Conciliation Act, 1996. Under section 12(5) and the Seventh Schedule an employee, consultant or adviser of a party cannot be the arbitrator, so the owner’s architect or engineer cannot decide disputes about the work they certify. The award is due within twelve months of the completion of the pleadings (section 29A); the fast track option (section 29B) decides on written submissions. The clause names the seat, whose courts supervise the arbitration.

    Stamp duty and registration

    Stamp duty is set by the State: its stamp act or schedule says what an agreement or a works contract pays. Buy the e-stamp or stamp paper before or when the parties sign. An instrument that is not duly stamped cannot be admitted in evidence until the duty and a penalty are paid (Indian Stamp Act, 1899, section 35). The checks link the stamp and registration department of the State you choose, where it was checked.

    The agreement does not create, transfer or extinguish a right in the land or the building, so it is not among the documents that section 17 of the Registration Act, 1908 requires to be registered; the parties may still register it (section 18).

    Labour laws and the building workers’ cess

    The contractor employs the workers and undertakes the duties of the Code on Social Security, 2020 and the Occupational Safety, Health and Working Conditions Code, 2020 as they apply to the work, with the site safety measures the agreement lists. Work for an individual’s own residence whose total cost does not exceed ₹50 lakh (or a higher limit the government notifies) is outside "building or other construction work" in the Code on Social Security (section 2(6)); above it, the building workers’ cess is levied at 1% to 2% of the cost of construction as notified (section 100). The agreement says who pays it.

    Sources

    Limitations

    • A generic template for building a house or a small commercial job in India, not legal advice: have a lawyer review it against your facts before you sign.
    • Stamp duty is set by each State; the tool does not work out the duty. The checks link the State’s department where it was checked.
    • Every figure — the price, the stage shares, the damages, the retention — comes from your entries; the tool does not check market rates or whether the price is right.
    • A development agreement that gives the builder a share of the land or the flats, a builder–buyer agreement for a flat and a government tender are different documents.
    • Indian-script names print in the DOCX and in Print; the PDF engine draws Latin and the Indian scripts it has fonts for, and the checks say if a character cannot be drawn.

    Privacy

    The agreement is made in this browser; nothing you type is sent to MySmartCoPilot or anyone else. A draft is kept on this device only if you tick “Keep a draft in this browser”.

    Frequently asked questions

    What do I get without a pass?

    Without a pass, Construction Agreement Generator (India) shows every page with your details, the first part of the wording readable and the rest hidden, marked “MySmartCoPilot preview · not for use”. Until you unlock it, the result can’t be downloaded, copied or printed. A Premium or Ultimate pass, a one-time payment that never renews, unlocks the full result. The pricing page lists the passes and their prices.

    Is a construction agreement from a generator enough, or do I need a lawyer?

    The generator writes a careful generic agreement, but it is not legal advice. Have a lawyer read it against your facts before you sign, stamp it as your State requires and have it signed by both parties and two witnesses.

    What is the difference between a labour contract, a material-and-labour contract and a turnkey contract?

    In a labour contract the owner buys the materials and the contractor provides labour, supervision and tools. In a material-and-labour contract the contractor also provides the materials. A turnkey contractor completes the building ready for use, finishing and services included, and hands over the keys.

    How much should the liquidated damages for delay be?

    A genuine pre-estimate of the owner’s loss from each week of delay — rent for other accommodation, interest on the loan, other costs — with a maximum. Under section 74 of the Indian Contract Act a court allows reasonable compensation up to the amount named, so a figure far above the likely loss may not be recovered in full. The CPWD conditions use 1.5% of the tendered value a month, at most 10%, for comparison.

    Does a construction agreement have to be registered?

    Not under section 17 of the Registration Act, 1908: it does not create or transfer any right in the land or the building. The parties may register it voluntarily (section 18). It does have to be stamped as the State’s stamp law requires.

    Can the owner’s architect or engineer be the arbitrator?

    No. Section 12(5) of the Arbitration and Conciliation Act, 1996, with its Seventh Schedule, makes an employee, consultant or adviser of a party ineligible. The clause appoints a sole arbitrator by agreement, or under section 11 if the parties cannot agree.

    Can I use the stages from the Construction Cost Calculator?

    Yes. Press “Construction Cost Calculator’s stages” to start from its stage list, or import the CSV it downloads: the generator reads its “Stage, Share %” table. You can also make slab-wise stages for the number of floors.

    What is retention money and when is it paid back?

    A small percentage of each payment the owner holds back as security for defects. Choose when it is released: half on completion and half at the end of the defects liability period, all at the end, or all on completion against a bank guarantee.