Construction WIP Schedule (Over and Under Billings)

The work-in-progress schedule your bank and surety ask for, job by job.

Free preview, no sign-upIncluded in your pass Premium tool Premium pass: ₹799 / $19.99 for 30 days On this device; its files download once
+2 +1 more details No upload Finance

Free preview: the schedule totals and the first jobs of the schedule (up to 10) with their figures; the other jobs, their flags and the files stay locked. Locked until you unlock it: download and print.

Premium pass ₹799 for 30 days or ₹249 for 1 week, one‑time. Premium pass $19.99 for 30 days or $7.99 for 1 week, one‑time. How to unlock

Try before you buy.

  • Free preview: the schedule totals and the first jobs of the schedule (up to 10) with their figures; the other jobs, their flags and the files stay locked.
  • Locked until you unlock it: download and print.
  • Unlock: Premium pass, ₹799 for 30 days or ₹249 for 1 week, a one-time payment unless you choose automatic renewal. Unlock: Premium pass, $19.99 for 30 days or $7.99 for 1 week, a one-time payment unless you choose automatic renewal.

Ways to unlock shows how to get the full result.

See passes (opens in a new tab)

Printing this result is locked in the free preview.

Contractor WIP Percentage of completion, cost-to-cost · worked out on your device

The jobs

One row per job: contract value (with approved change orders), estimated total cost, cost to date, billed to date and, if you like, the bid margin and the margin on your last schedule. Up to 500 jobs; the file is read in this browser.

Paste rows instead copied from a spreadsheet, with the header row
The first row holds the headings, as in the template: Job, Contract value, Estimated total cost, Cost to date, Billed to date.

Schedule details and flags

Against the bid margin, or the last schedule’s when no bid margin is given.
Of the job’s contract value.

Next steps Done. What next?

Start over

A Premium pass unlocks the full result. See passes

All finance calculators

Results are estimates for general information and planning, not financial advice. Banks and institutions may calculate differently (rounding, fees, rate changes). Confirm figures with your lender or a qualified adviser before deciding.

How this tool is checked

Based on
the method set out under ‘How the schedule is worked out’.
Sources

This guide cites 3 sources:

Tests
23 automated tests check its results.
Found an error?
Report a problem or write to support@mysmartcopilot.com, with what you entered and the result you expected.

How we check our tools

About the Construction WIP Schedule (Over and Under Billings)

A work-in-progress (WIP) schedule shows, for every open job, how much of the contract you have earned and whether your billings are ahead of the work or behind it. Banks and surety companies ask for it with your financial statements, because it is where profit fade, unbilled work and loss jobs show first.

Type or import your jobs: the contract value (with approved change orders), the latest estimated total cost, the cost to date and what you have billed to date. The schedule works out each job's percent complete by the cost-to-cost method, the earned revenue, the gross profit to date and the over or under billing, totals them, and flags loss jobs, costs over the estimate, under-billed jobs and margins that have faded against the bid (or your last schedule) by more than the points you set.

Without a pass the schedule is a free preview: the schedule totals and the first jobs (up to 10) with their figures. The other jobs, their flags and the Excel, PDF and CSV files unlock with a Premium pass. Everything is worked out in your browser; nothing is uploaded.

How to use it

  1. Type each job, or import your job-cost report as CSV or Excel (the template shows the columns; “Revised contract”, “Est. cost at completion”, “JTD cost” and “Billings to date” are recognised too). With only a cost-to-complete column, the estimated total cost is the cost to date plus the cost to complete.
  2. Use the contract value with approved change orders and the latest estimate of total cost, not the original bid budget: the schedule is only as good as the estimates.
  3. Add the bid margin (or the margin on your last schedule) to see fade, and set the flags: the margin fall that should be explained and the under-billing that should be chased.
  4. Read the totals and each job’s billing position, then follow the flags before the schedule goes to your bank or surety.
  5. Without a pass the result stays a free preview; unlock it with a Premium pass to see every job and download the Excel, PDF or CSV schedule or print it.

Examples

A clinic fit-out, 60% complete
Input
Contract 1,850,000 · estimated total cost 1,572,500 · cost to date 943,500 · billed 1,050,000
Result
Percent complete 60% (943,500 ÷ 1,572,500) · earned revenue 1,110,000 · gross profit to date 166,500 · under-billed by 60,000 (billed 1,050,000 against 1,110,000 earned).
A roof job that will lose money
Input
Contract 420,000 · estimated total cost 436,800 · cost to date 262,080 · billed 268,000
Result
Expected loss 16,800 · 60% complete shows a gross loss to date of 10,080 · the remaining 6,720 is the loss provision · over-billed by 16,000.
Profit fade on a warehouse slab
Input
Bid at a 12% margin; estimated total cost now 588,800 on a 640,000 contract
Result
Estimated margin 8%: a fade of 4 points, flagged at the default limit of 2 points.

Common uses

  • A contractor preparing the WIP schedule for the year-end or quarterly statements that a bank or surety asks for.
  • A construction accountant reviewing over and under billings before closing the month.
  • A project manager seeing which jobs have faded since the bid and which need a bill sent.
  • An owner checking how much of the backlog is profit before taking on more work.

How the schedule is worked out

  • Percent complete = cost to date ÷ estimated total cost (the cost-to-cost method), held at 100% when costs run past the estimate.
  • Earned revenue = percent complete × contract value.
  • Gross profit to date = earned revenue − cost to date.
  • Over (under) billing = billed to date − earned revenue. A positive amount is billings in excess of costs and estimated earnings (a liability: you have billed ahead of the work); a negative amount is costs and estimated earnings in excess of billings (an asset: work done and not yet billed).
  • Cost to complete = estimated total cost − cost to date; backlog = contract value − earned revenue.
  • Loss jobs: when the estimated total cost is above the contract value, the whole expected loss is recognised at once; the loss provision is the part of it that the gross loss to date does not show yet, (1 − percent complete) × expected loss.

The cost-to-cost comparison is the one US tax law prescribes for the percentage of completion method of long-term contracts (26 U.S.C. § 460; the completion factor of 26 CFR § 1.460-4 compares contract costs incurred with estimated total contract costs). Under IFRS 15 revenue over time follows a measure of progress, of which costs incurred is one, and under IAS 37 an onerous contract gives rise to a provision.

What the flags mean

  • Loss job: the estimate at completion is above the contract value. Book the whole expected loss and review the estimate.
  • Cost over estimate: cost to date is already above the estimated total cost; the estimate to complete is out of date.
  • Fading margin: the estimated margin is below the bid margin (or the margin on your last schedule) by at least the points you set. Find the costs that grew and the change orders not yet signed.
  • Under-billed: unbilled earned revenue above the share of the contract you set. Bill the work, or check whether costs were posted to the wrong job.
  • Billed above contract, final bill due and billed before cost point to change orders, retention and posting to look at.

Why lenders and sureties read it closely

Under-billings are revenue you have earned on paper but not invoiced, so they depend on the cost estimates being right; a schedule with large or growing under-billings, or margins that fade from one schedule to the next, is the usual first sign of a job in trouble. Over-billings are cash collected ahead of the work and are owed back as work: they finance the job while it lasts. Comparing each schedule with the last one, job by job, shows the trend.

Limitations

  • It uses the cost-to-cost method only. Jobs measured by units completed, surveys or milestones need a percent complete from those measures.
  • Retention, uninstalled materials and costs that are not progress (mobilisation paid ahead, materials stored on site) are not separated: leave them out of the cost to date where your accountant does.
  • Contracts, estimates and billings are your figures; the schedule cannot check them against your books.
  • Up to 500 jobs in one schedule. Amounts are rounded to cents job by job and the totals add the rounded amounts.
  • An estimate for planning and review, not an audited statement, tax advice or a substitute for your accountant’s work.

Privacy

On this device; its files download once

Your jobs are worked out in your browser and never uploaded or stored. An imported file is read on your device and kept only while the page is open.

How to check that nothing is uploaded

Frequently asked questions

What do I get without a pass?

Without a pass, Construction WIP Schedule (Over and Under Billings) shows the schedule totals and the first jobs of the schedule (up to 10) with their figures; the other jobs, their flags and the files stay locked. Until you unlock it, the result can’t be downloaded or printed. A Premium or Ultimate pass, a one-time payment unless you choose automatic renewal, unlocks the full result. The pricing page lists the passes and their prices.

What is over billing and under billing?

Over billing means you have billed a job for more than the revenue its progress has earned: billings in excess of costs and estimated earnings, shown as a liability. Under billing is the reverse: the work earned more than you have billed, shown as an asset. Both come from comparing billed to date with earned revenue (percent complete × contract value).

How is percent complete worked out?

Cost to date divided by the latest estimated total cost of the job. A job with 943,500 spent of an estimated 1,572,500 is 60% complete, so it has earned 60% of its contract value.

Should I use the original budget or the current estimate?

The current estimate at completion. The original budget hides overruns: a job that has used its whole budget but still needs months of work would show as nearly complete, and its revenue and profit would be overstated.

What is profit fade?

The fall in a job’s estimated gross margin from the margin it was bid at, or from the last schedule. Fade of a few points on several jobs, or a steady fall from schedule to schedule, is what lenders and sureties look for first.

How is a loss job treated?

The whole expected loss is recognised as soon as it is known, not as the work goes on. The schedule shows the gross loss to date and, as the loss provision, the part of the expected loss that is still to come.

Are my figures uploaded?

No. The jobs you type or import are worked out in your browser and are not sent or stored anywhere.

Sources

The official pages, laws, guidelines and studies this page cites.

Cite this page

APA 7

MySmartCoPilot. (n.d.). Construction WIP Schedule (Over and Under Billings). https://mysmartcopilot.com/tools/construction-wip-schedule/

MLA 9

“Construction WIP Schedule (over and under Billings).” MySmartCoPilot, mysmartcopilot.com/tools/construction-wip-schedule/.

Quick answers and tool search

Type to search tools or to get a quick answer, for example 18% of 2500. Use the up and down arrow keys to move through the results, Enter to choose, and Escape to close.